QC Department works
according to these standards
ISO 9001/200, ISO/TS29001
and his goals is the policy of quality in company.
Increasing the customer satisfaction and evaluating customer's
proposals, attract, protection and promotion of efficient human resources, promotion
quantitative level of products, creating the stimulation system with structure indication
of personnel's participation in efficacy of human resources.
Improving performance of secondary contractors
With regard to the policy of quality that has been defined
the original work in Quality Control Department, Its duty begins with purchasing
of raw materials and entrance of them and continues until exit of the final product
and sending the booklet of final product. In this regard the stages of what the
quality control does, can be division in the following:
1.Raw materials control:
In raw material's arriving after the warehouse's rendition and
issuance of temporary receipt and handing over to the store, It will be evaluated
by the Quality Control Department. In all cases where a certificate is needed (according
to its special standard) with their testimony it will be controlled and after upholding
will be allowed to enter the Department of production.
2. Control in production line: These controls are divided
to tangible and intangible control groups.
Tangible controls:
QCP
(Quality Control Plan) controls that is done with
the agreement of employer and third inspector. These
controls will be done every day and at a time when the QCP document is
needed to report, it will be registered and will be handed over to the third inspector
and employer.
Intangible controls:
The controls that their time has been mentioned but is done by experts of Quality
Control Department continuously Like terms of taking care of the pieces,
conditions for keeping electrode, Temperature cooking and preserving of electrodes, It is worth mentioning that if in every
phase of controlling raw materials and control at the making time, a contradiction
got detected, trends will be in registered
in NCR special form and will be sent to related Department for removing the trends
and amending it.
3.QC documents: These
documents include providing QCP
, WPS
,
PQR
, WQT
,
NDT Procedure
, Weld
Repair Procedure
, test procedure
و
P.W.H.T Procedure
,. . .
QCP=
Quality control plan
WPS=
Welding procedure specification
PQR=
Procedure Qualification Records
WQT=
Welder Qualification Test
N.D.T=
Nondestructive test
·
VT
·
PT
·
MT
·
UT
·
RT
P.W.H.T= post
weld Heat treatment