     QC Department  
   

QC Department works according to these standards ISO 9001/200, ISO/TS29001 and his goals is the policy of quality in company.

 

Increasing the customer satisfaction and evaluating customer's proposals, attract, protection and promotion of efficient human resources, promotion quantitative level of products, creating the stimulation system with structure indication of personnel's participation in efficacy of human resources.

 

Improving performance of secondary contractors

 

With regard to the policy of quality that has been defined the original work in Quality Control Department, Its duty begins with purchasing of raw materials and entrance of them and continues until exit of the final product and sending the booklet of final product. In this regard the stages of what the quality control does, can be division in the following:

 

1.Raw materials control: In raw material's arriving after the warehouse's rendition and  issuance of temporary receipt and handing over to the store, It will be evaluated by the Quality Control Department. In all cases where a certificate is needed (according to its special standard) with their testimony it will be controlled and after upholding will be allowed to enter the Department of production.

 

2. Control in production line: These controls are divided to tangible and intangible control groups.

 

Tangible controls: QCP (Quality Control Plan) controls that is done with the agreement of employer and third inspector. These controls will be done every day and at a time when the QCP document is needed to report, it will be registered and will be handed over to the third inspector and employer.

 

Intangible controls: The controls that their time has been mentioned but is done by experts of Quality Control Department continuously Like terms of taking care of the pieces, conditions for keeping electrode, Temperature cooking and preserving of electrodes, It is worth mentioning that if in every phase of controlling raw materials and control at the making time, a contradiction got detected, trends will be in registered in NCR special form and will be sent to related Department for removing the trends and amending it.

 

3.QC documents: These documents include providing QCP , WPS , PQR , WQT , NDT Procedure , Weld Repair Procedure  , test procedure  و P.W.H.T Procedure ,. . .  

 

 

QCP= Quality control plan

WPS= Welding procedure specification

PQR= Procedure Qualification Records

WQT= Welder Qualification Test

N.D.T= Nondestructive test

·      VT

·      PT

·      MT

·      UT

·      RT

P.W.H.T= post weld Heat treatment

 

 

These documents will be prepared specifically for every project and will be sent to employer and after endorsement will be considered to work in this Department.

 

4. QC sorting and collecting documents:  All documents for every project will be hold in a book called Final Book and this book will be the product's identity.

 

5. Weld Gauge calibration: Calibration of tools is one of the most important duties of QC Department. Tools in use to control are Caliper- Micrometer-rule-pressure meter-Diameter-Protractor-Laser Thermometer-Plate Diameter-Color Diameter.                                                                  

All of these tools are calibrated by third company and with timing certificate is in use.

 

6. Training during personals work by QC Department: The education requirements have been determined according to the company needs and will be done after management confirmation. This education is very effective in raising the level of quality and quantity of the work.

 

7. Finished jobs will be announced to employer after dimension and eye control and the will get ready for final tests. This test will done by QC Department and the employer. After issuance of final confirmation the product is ready for next process that is coloring and Sound blast. Finally with preparation of packing and terms of carriage, product will be ready to send. Meanwhile the identity book will be prepared step by step.

 

 
 

 
 Products
  Shell & Tube 
  Air Cooler 
  Pessure Vessle 
  Tank 
  Finned Tube 
  Package 
 
 Informations
  Application Form 
  Certificates 
  Catalogue 
 
 Departments
  Production Dep. 
  Engineering Dep. 
  Planning Dep. 
  QC Dep. 
  Sales Dep. 
  Commercial Dep. 
 
 Gallery
   
   
   
 
Address: 19th km Karaj Special Road - Tehran - Iran Post Code : 37515 - 316
Management Tel : +98 21 - 44989255 , 6 - 44988632 , 34 Sales Dep. Tel : +98 21 - 44989253 , 59
Fax : +98 21 - 44989257 Sales Dep. Telefax : +98 21 - 44981024
Office : +98 21 - 44989250 , 51 , 54 , 58 - 44981021 Email:Info@kavehmobadel.com